বর্তমানে নতুন লাইন সম্প্রসারণের জন্য বিদ্যুৎ উন্নয়ন বোর্ড কর্তৃক প্রজেক্ট চলমান।

 

 

The objective of distribution planning is to assure that the growing demand for electricity in terms of increasing growth rate and high load density, can be satisfied in an optimum way.

 

Distribution planning starts at customer level. The demand, type, load factor and customer load characteristics dictate the type of distribution system required. The most important considerations for short term planning are:

 

  • Minimizing the cost of laterals, feeders, sub-transmission systems, substations, equipment required for control and protection and cost of losses while respecting the limits set by permissible voltage values, voltage dips and flicker
  • Maintaining service continuity, reliability and security of the system
  • Taking into account factors like transformer impedance, insulation levels, availability of spare transformers and mobile substations, dispatch of generation and rates that are charged to customers

                       distribution_planning

                       Distribution lines through a country-side of Bangladesh 

For long term planning, the factors that are to be considered are:

 

  • The timing, location and type of energy demand
  • The duration and frequency of outage of equipment
  • Labor and money
  • Increasing fuel costs
  • Increasing or decreasing prices of alternative energy sources
  • Changing socio-economic conditions
  • Regulations of Federal and State governments

Distribution planning involves various activities like load forecasting (type, location and amount), electrical and mechanical design, economic and other considerations in planning. Automation has also become important in distribution planning.